Open Access Journal

ISSN : 2456-1290 (Online)

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

Open Access Journal

International Journal of Engineering Research in Mechanical and Civil Engineering (IJERMCE)

Monthly Journal for Mechanical and Civil Engineering

ISSN : 2456-1290 (Online)

ORGANISATION OF COMMON VOSS ASEMBLY STATION FOR AUTOMOTIVE BRAKING VALVES WITH POKA-YOKE

Author : ANUJ KUMAR SHRIVASTAVA 1 MAHESH SHAHAPURE 2 DR. CHANDRABABU D 3

Date of Publication :7th June 2016

Abstract: The research focuses on study in Knorr-Bremse, a market leader in braking systems in both rail and commercial vehicles. In-house innovation is always required due to growing competition. Voss connectors are one of the major components of assembly in products of the valves manufactured here and each product has a separate Voss assembly station. This operation is critical with point of product and many a times a bottle neck in the assembly flow. The cost has been saved by setting a common Voss assembly station which would help to improve the efficiency of the plant, making assembly line lean and making the system error free, i.e., implementing Poka-Yoke. The valves could be then sent to the assembly lines for further operations. With the present work the company would reduce to 3 assembly station from 13 and the cost would be saved on operators, inventory, cost of maintaining spares and floor space consumed. The savings then could be past to product which would help to fight the market share

Reference :

    1. Chen, Jack, “Achieving maximum supply chain efficiency." IIE Solutions Vol 29 Iss, 6, pp. 30-36. 1997
    2. Graham C. Stevens,.“Integrating the Supply Chain", International Journal of Physical Distribution and Materials Management, Vol. 19 Iss: 8, pp: 3 – 8, 1989
    3. Boysen, N., Fliedner, M., & Scholl, A. “Sequencing mixed-model assembly lines: Survey, classification and model critique." European Journal of Operational Research, Vol 192 Iss 2, pp: 349-373, 2009
    4. Merengo, C., Nava, F., & Pozzetti, A "Balancing and sequencing manual mixed-model assembly lines." International Journal of Production Research, Vol 37 Iss12, pp: 2835-2860, 1999
    5. Erlandson, R. F., Noblett, M. J., & Phelps, J. A., "Impact of a poka-yoke device on job performance of individuals with cognitive impairments. Rehabilitation Engineering", IEEE Transactions on, Vol 6 Iss 3, pp: 269-276, 1988
    6. Burkitt, K.H., Mor, M.K., Jain, R., Kruszewski, M.S., McCray, E.E., Moreland, M.E., Muder, R.R., Obrosky, D.S., Sevick, M.A., Wilson, M.A., "Toyota production system quality improvement initiative improves perioperative antibiotic therapy", The American journal of managed care, Vol 15 Iss: 9, pp: 633-642, 2009
    7.  Ajit Kumar Sahoo, N.K.Singh, Ravi Shankar, M. K. Tiwari,, "Lean philosophy: Implementation in a forging company", The international Journal of Advanced manufacturing Technology. Vol 36 Iss5, pp:451, 2008
    8. Tsou, J. C., and Chen, J. M. "Dynamic model for a defective production system with PokaYoke.” Journal of the operational research society, 799-803, 2005
    9.  Bukchin, J., Dar-El, E. M., and Rubinovitz, J., "Mixed model assembly line design in a make-toorder environment." Computers & Industrial Engineering, Vol 41 Iss4, pp: 405-421, 2002

Recent Article