Open Access Journal

ISSN : 2456-1290 (Online)

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

Open Access Journal

International Journal of Engineering Research in Mechanical and Civil Engineering (IJERMCE)

Monthly Journal for Mechanical and Civil Engineering

ISSN : 2456-1290 (Online)

Development of Analytical Framework on Optimization of Construction Equipment for Multiple Infrastructure Projects

Author : Mr. Amit Shriwas 1 Dr. Sudhir Nigam 2

Date of Publication :7th January 2017

Abstract: India’s gross domestic product (GDP) grew by 7.6 per cent in the year 2015-16, has made India the fastest growing economy in the world. Considering the importance of Infrastructure growth, a critical factor for the continued economic growth of the country, the Ministry of Road Transport and Highway - Government of India has proposed Rs 25 trillion investment in infrastructure for the next three years (2017-2020) duration imparting major share for developing 27 industrial clusters and for road, railway and port connectivity projects. Construction equipment plays vital role for development of Infrastructure. Construction equipment’s operational cost contributes 36 percent of the total project cost. Hence effective equipment management plays important role in infrastructure project management resulting into the substantial cost saving. In this research paper author have analyzed two infrastructure (highway development) projects comprising construction of bridges, reinforced earthen wall, culvert and vehicular underpasses. Critical path method is applied for the time and activities scheduling along with construction equipment allocation for both the project. During study float availability is identified as main influencing factor and the same is analyzed to optimize the construction equipment in infrastructure project.

Reference :

    1. National Highway Authority of India (Ministry of Road Transport and Highway – Government of India)
    2.  “Construction Planning, Equipment and Meyhods” by “Robert L. Peurifoy, Cliff J. Schexnayder, Aviad Shapira”, McGraw Hill Publication; 2007 edition.
    3. “Downtime model development for construction equipment management” by “Mr. Madhav Prasad Nepal and Mr. Moonseo Park (Assistant Professor at National University of Singapore, Singapore)”. Journal - Engineering, Construction and Architectural Management – 2004
    4. “Heavy Equipment Management Practices and Problems in Thai Highaway Contractor” by “Thanapun Prasertrungung and B.H.W. Hadikusumo at Asian School of Technolgy, Thailand”, Journal - Engineering, Construction and Architectural Management -2007.
    5.  “Construction and Project Management for Engineers, Architects, Planners and Builders” by “K.G. Krishnamurthy and S. V. Ravindra”, CBS (1 December 2008) “Construction Management and Equipment” by “Saurabh K. Soni”, S.K. Kataria & Sons Publication; 2014 edition.
    6.  “Roads ministry targets laying over 40 km of roads every day in 2016 - 17” by Rajat Arora, The Economic Times. 

Recent Article